The project involves the construction of a multi-store, multi-flat with 4 dwellings and a subterranean area.
To reduce the transmission from vibrations produced by the train passing on the Track located a few meters from the building, Isolgomma has provided the MEGAMAT ME 50 mat in different densities.
Requirement.
The nearby railway line was a source of vibrations that spread across the ground. These would surely have created noises inside the building
Suggested solution.
The proposed solution involved the construction of the foundations of the house on an anti-vibration system Megamat with the purpose of intercepting and reducing the disturbances of the railway line.
Result.
Increased in the living comfort of the building's users. Vibrations management that would have required maintenance actions in the long run